New Construction
Things to Know about New Gas Installation Projects
Applying for a new gas service installation reserves your place on the gas installation list. The City of Duluth Engineering department will review submissions and contact you regarding the availability of natural gas at your selected service address.
Applications are taken until September 1st of each year or until the funding limit is reached.
Installation generally occurs between May and November each year. Any private underground utilities (electricity, fuel lines, phone line to out buildings, underground dog fence, etc.) are the responsibility of the property owner to locate and mark prior to installation.
Residential New Construction
Complete a high-volume load sheet for properties over 400,000 BTUs
The location of the gas meter will be determined once the walls are constructed and the site is approaching final grade.
Commercial New Construction
Provide a copy of a site plan to determine the length of service and potential installation issues
Complete a high-volume load sheet for all properties
The location of the gas meter will be determined once the walls are constructed and the site is approaching final grade.
Request a Water Meter
Replumbing a property from a single metered unit, to each unit having its own meter? The additional meter will require a new billing account. Use the application for a secondary or to request additional water meters.
What happens after I apply?
- ComfortSystems representatives will contact you with any missing application information
- A City of Duluth Engineering representative will contact you with other needed information and discuss your options for payment of the natural gas service line
- You will schedule a gas meter location appointment
- Obtain permits
- Schedule an Installation Inspection after your appliance is installed